Yesterday I dropped off the rods, new pin bushings, new rod bolts+nuts, and new bearings to my machinist friend. He said he should be able to work on them today. The work to be done is:
- Weight match all rods
- Install new pin bushings
- Check specs on main bearings
- Bore main rod connector if needed
- Install rod bearings
- Demagnetize one rod bearing cap
- Check rod bolts stretch point for proper torque
Once all of this has been done, next it’s time to assemble the block. With his help on checking clearances and assembly, I can take the project from there and finish the rest myself. I pretty much have most of my parts and accessories cleaned. There is still a small bit of disassembly needed on the block that was originally in the car. However, I figure at that point i’ll be swapping things on a 1-to-1 basis from the old block to the new block.