Last Friday night (5/9/08) we assembled the rotating assembly in the block. Oil tolerances were within spec to slightly loose. The smallport head is done, and it was bolted down last night. The next items up for bid are:
- Install wear sleeve on rear main lobe
- Install rear main housing + seal
- Clean oil pan baffle, sump pickup, and pan
- Install baffle, pickup, pan
- Paint oil pan and touch up paint on block
- Measure shims
- Set valve lash
- Attach additional head components (water routing, sensors, etc.)






Leave a Reply